FOODMVS
SERVICE

SERVICE

Logistics transportation


  • Daily business point and customer confusion? 

1. Disordered logistics service: passive logistics demand, imperfect network, unable to provide all-round logistics services.

2. Nonstandard logistics system: unstable service quality, waste of resources, uneven quality and lack of standardization promotion.

3. Imperfect information system: opaque information, low sharing ability, low communication efficiency, high error rate and poor information service quality.

4. Nonstandard operation management: manual operation without training, poor service consciousness and low risk control ability. 

 

  • What are you most worried about? 

1. Damage to goods, such as high value, precision equipment, etc

2. Tardiness -- for example, goods in urgent need

3. Theft -- such as high value, daily necessities, etc

4. Vibration - such as fragile products, fragile packaging, etc

5. Wet loss, such as wood products, clothing, etc

6. Dust - such as precision instruments, food, goods entering the counter, etc

  • Service commitment

全陪:full compensation

货损:Cargo Damage (或者Damage)

丢失:Lost

迟到:Late

  • We can help you

1. LCL transportation: more than 200 cities in China, high-quality carriers, each line can be used for return transportation, each line can select risk control, market conditions, price advantages, professional operation and customer service team.

2. Charter transportation: professional transportation team, advantageous price, understanding of parking lot price, experience in vehicle management and professional monitoring technology.

3. National Express: Daily departure of land flights, the latest and most advanced vehicles, the whole process of high-speed, double drivers, GPS monitoring of vehicles (for example: 20 hours in Beijing, 24 hours in Guangzhou, 30 hours in Shenyang)

4. Cold chain service: we have a professional refrigerated fleet and cold storage. We have experience in operating related food cold chain. We have complete information system.

5. Urban distribution: vehicles can't travel in the urban area, carry them upstairs, various vehicles, GPS monitoring throughout the whole process, and we can charge according to the customer's requirements (we can charge according to the number of vehicles, tonnage, points and distance).

6. Warehousing service: different types of warehouses, perfect storage system, package service and free storage service.

7. National transportation network coverage

8. There are a variety of available models, such as: 10 tons car, 20 tons car, tail plate car, flying wing car, 17 meters car, 12.5 meters flying wing car, 2 tons flat car, 12.5 meters flat car, refrigeration car.

  • Service cases

 

 

All of the major exhibitions will be held in a certain city, and the exhibition schedule needs to be arranged in all major cities.

Customer requirements:

1. Arrive at the scene on time and no accident is allowed.

2. When the vehicle is delivered to the exhibition site, all the packing materials need to be taken away from the site. After the exhibition, we need to take the packing materials to pick up the goods.

3. The storage of goods needs to be solved outside the exhibition time.

Solutions

1. Abundant resources can be mobilized to effectively solve the possibility of vehicle accidents affecting the exhibition schedule.

2. Effectively solved the problem of packing materials taken away from the site

3. Cooperative warehouses and vehicles can reduce the cost of pressing goods during the waiting period, and flexibly handle the customer demand services such as picking up and delivering goods between cities.

 

Operation process

1. Set up a project team and formulate the operation process, emergency plan and project address book

2. The project team shall inform the branch company to arrange vehicles and arrange project operators according to the project schedule, and issue operation process, emergency plan, project address book and basic training for operators

3. Prepare emergency preparation, standby vehicles, standby personnel and spare tools for each link.

4. The project team monitors each link by section, summarizes the customer satisfaction and customer reaction problems every day, and improves the operation process.

Take photos and operate on file 5.

6. Solve the non transportation difficulties encountered by customers.For example: customer equipment failure, we use local resources to give full support.